Английский язык для студентов специальности "Самолето- и вертолетостроение" - page 104

102
missiles, including long-range types. The maximum ordnance load of the Su-35 is
8,000 kg. This is placed in 12 weapon stations.
Status of the program
Nowadays, the first flying prototype of Su-35 is undergoing ground tests. Its
first flight took place on February 19, 2008. Following the first prototype, now on the
assembly line of KnAAPO (Komsomolsk-on-Amur Aviation Production Association)
are a further two examples of Su-35. Those will join the tests this year. The
production and delivery of Su-35s to customers are scheduled for 2010. They will
continue with the emergence of a fifth-generation fighter on the market.
SUKHOI SUPERJET 100
Рис. 9. Sukhoi Superjet 100
Sukhoi Superjet 100 aeroplane family is being developed based on the
principle of maximum standardization of frame assemblies and systems, viz.: wings,
fins, chassis, engine unit, crew cabin, basic aeroplane systems and component parts.
The standardization of the design will make it possible to improve the
economic performance of the aeroplane family operation with expenditures kept at a
rational level.
The aerodynamics and design of the aeroplanes of the family are based on
proven advanced technology to minimise technical risks at the stage of design, testing
and operation.
To broaden the customer base among airlines, each of the 2 standard sizes of
the aeroplanes of the family (for 75 and 95 seats)has a basic and a LR modification
designed for use on a network of various-length routes to make it possible for airlines
to improve the economic performance of their operations through a more balanced
composition of their fleets based on the route structure and passenger flows.
The Sukhoi Superjet 100 aeroplane family conforms to current and long-range
requirements of Russian and global market in commercial aeroplanes. The design
meets the specific requirements of airlines in Russia, the CIS, and western countries,
and conforms to the Aviation Rules AP-25, FAR-25, JAR-25 requirements.
1...,94,95,96,97,98,99,100,101,102,103 105,106,107,108,109,110,111,112
Powered by FlippingBook